Dr. Samar Mubarakmand, 2007

Not new, but a lot of PAEC folks made informative statements at the 2007 Memorial Reference for Munir Ahmad Khan. For example….Dr. Samar Mubarakmand, Chairman NESCOM, former PAEC:

Not new, but a lot of PAEC folks made informative statements at the 2007 Memorial Reference for Munir Ahmad Khan. For example….Dr. Samar Mubarakmand, Chairman NESCOM, former PAEC:

”He was responsible for setting up Pakistan’s nuclear fuel cycle program, which culminated in providing indigenously manufactured fuel for the Karachi nuclear power plant. There was a time when Canada stopped the supply of fuel and spare parts for Kanupp and it was said that the streets of Karachi would go dark, but the indigenous fuel produced as a result of his efforts enabled Kanupp to successfully run despite sanctions. In developing the nuclear fuel cycle program, Mr. Munir Ahmad Khan established various nuclear facilities throughout the country. The offshoot of this nuclear fuel cycle program half way down the line gave us the uranium gas for Kahuta which we enriched and which was used in our nuclear weapons program”

The Kahuta enrichment project itself was envisaged by PAEC, it was a project on which we did a lot of exploratory and research work for separating U-235 and U-238. Various techniques for enrichment including laser, centrifuge and diffusion were explored and groups formed by him to study these methods. I was responsible for one of these groups. Then finally a group was formed to study the gas-centrifuge method for uranium enrichment. This was a very big project for which he laid solid foundations for which credit must be attributed to Mr. Munir Ahmad Khan” 

”Then he established the entire infrastructure for the designing, manufacturing and testing of nuclear weapons for the air force, for the missiles, for tactical weapons. He also set up explosive plants, high-speed electronics facilities, precision and mechanical plants for the nuclear weapons program.”

”The Chaghi tunnels were also selected, built and made ready during his time. The Chaghi test site was selected by him in 1975/76 and was ready by 1980. He was a great manager of men and he pushed the people to do all this work and he brought out the best in the scientists and engineers of PAEC.”

”Pakistan’s nuclear infrastructure was the result of his hard work and his vision. On the plutonium side, the New Labs reprocessing project was also completed under his leadership. He also began work on the Khushab plutonium production reactor, which is also an example of his vision.”

”PINSTECH was also expanded and completed during his tenure. He also set up Karachi Institute of Nuclear Power Engineering and Centre for Nuclear Studies. There were many other institutions and organizations and projects which were established by Mr. Munir Ahmad Khan which I cannot name here. “